Another busy weekend at the build. We took delivery of the 2-ply 1 3/4" x 11 7/8" LVL beam (30’ long) along with all the rafter material. A couple of family members came out to help, and just getting everything carried onto the deck was a workout in itself. The beam was assembled with 50 structural screws and about a tube and a half of PL.
Hefting the last 16 feet of it up onto the supports and lining up the overhangs was an adventure — a couple of ladders, some improvising, and a few choice words later, it was in place.
Rafters went on fairly smoothly after burning one board to get the math right for a template. Unfortunately, we didn’t realize until all the loft rafters were up that the loft walls were missing their double top plate. That meant pulling every one back off and re-cutting them to the adjusted wall height. Frustrating, but that’s part of the process — shit happens.
One thing that did catch me off guard was the hardware cost. The Strong-Tie brackets for the rafter-to-beam connections were $17 each, and with those, the hurricane ties for the rafter-to-wall connections, and the proper screws, the total was over $1k. Painful, but necessary.
Next steps:
- Install doors and windows
- Build out the gable ends
- Sheath the roof in prep for metal
- Call for the framing inspection (which I’m sure will come with a few fixes to address, although theyve been very reasonable so far)
All in all, progress is moving along nicely — it’s starting to feel like a real cabin now that the roofline is taking shape.
We are very much amateur builders and this is an off grid cabin in the woods, be gentle.